Diablo Canyon: The Devil's in the Details; Part 1: A Troubled History....
/The shutdown of Diablo Canyon and its two atomic reactors by 2025 is the result of a joint proposal among Pacific Gas & Electric (PG&E), environmental, and labor groups. This action is neither the beginning nor the end to the decades long story of Diablo Canyon’s design, construction, and operation. PG&E’s promise to replace the nuclear power generated by Diablo Canyon’s two reactors with renewable energy and to no longer seek a 20-year license renewal for these atomic reactors comes with a cost. The two reactors located on multiple California fault lines will continue to operate for nearly a decade more.
Read More